Industrialisation strategy
Should I industrialise, how much and with what? A short, fixed-price engagement with a comparable index.
ForFunds, developers and architects

A way of working to design, manufacture and build better.
Why now
1.0Industrialised construction is set to become the new way to design, manufacture and build. But the decision is made project by project: whether to do it, how much and with whom.
Maximum does not mean optimal: industrialise what matters, when it matters.
The three starting questions
Labour shortages, housing demand, pressure on timescales and sustainability, and public support for industrialised housing.
Today the answers to those questions usually come from the manufacturer: free of charge and with a vested interest.
Prefabricated bathrooms or a prefabricated façade do not change the outcome if every building is still a prototype.
Industrialisation strategy, DfMA engineering, digitalisation and software. At Wise Build they are all under one roof.
The thesis
2.0Every building is a prototype
One-off building
Every building is the first of a series
Kit of parts
01
02
03
The method
2.1A cycle that learns
↺ next building · v+1
Two layers
Strategy · Monitor · Client manual · Continuous improvement
Engineering through to the factory
The method belongs to the whole company; the industrialised construction line is its spearhead.
Three disciplines
DfMA: design for manufacture and assembly.
Strategy, systems and supply chain.
From the BIM model to the factory and the operational twin.
Configurators and proprietary data.
Collaborative planning for factory and site.
In alliance with a specialist partner.
What we do
2.2Should I industrialise, how much and with what? A short, fixed-price engagement with a comparable index.
ForFunds, developers and architects
A system of your own: manual, kit of parts, archetypes and configurator.
ForFunds and developers with a portfolio
Flagship service
From phase zero to handover. It safeguards the strategy and captures the knowledge.
ForFunds and developers
Detail engineering through to the factory, from BIM to CNC, and product development.
ForArchitects, contractors and manufacturers
Configurators, BIM-to-factory connection, digital twin and systems database.
ForIndustrial firms and manufacturers
Courses and workshops for project, factory and site teams.
ForArchitects and contractors
The flagship service
2.3Decision
where the expensive decisions are made
Design
Factory
Logistics
Assembly
Handover and operation
01Strategy
four axes + economic feasibility · industrialisation index
04DfMA and productisation
from design to the workshop
LeanIn alliance
logistics and assembly
05Technology
handover digital twin
Who we work with
2.4Funds and developers
with a portfolio: rental, hotels, residences
Leading architects
who are required to industrialise
Contractors
in design & build: training and cross-cutting engineering
Systems integrator and specifier05
Database of components, manufacturers and supply chain, at the service of the project
Precasters
concrete, steel, timber, bathrooms, building services
Manufacturers
product development and digital factory
Systems and patents
looking to enter Spain
Independence rule
We never take payment from a manufacturer for recommending their system.
Results
3.0−40%
time and cost in one client's structural system
−30%
time and cost in their façade system
+1,000
Plan Vive homes: engineering, digital fabrication and automation
14
projects using the methodology for a single client
References
Under one roof
+70 professionals: architects, engineers and developers.
How we start
4.0On a first project
It does not take on site supervision: it oversees fidelity to the system and to the quality criteria.
Should I industrialise, how much and with what? Let's start with the strategy.


Frequently asked questions
5.0It is Wise Build's way of working for industrialised construction: from project to product. It brings together industrialisation, digitalisation and lean so that each client has a system of its own (manual, kit of parts and archetypes) that improves with every project.
Industrialisation strategy, asset-type platform, Project Monitor, DfMA and productisation, technology (configurators, BIM-to-factory connection, digital twin) and training for project, factory and site teams.
The role that accompanies the project from phase zero to handover, safeguards the industrialisation strategy and captures the knowledge. It does not take on site supervision: it oversees fidelity to the system and to the quality criteria, like the project monitoring that funds already know.
It does so independently: Wise Build never takes payment from a manufacturer for recommending its system.
Reductions of 40% in time and cost in one client's structural system and of 30% in its façade system, plus the engineering, digital fabrication and automation of more than 1,000 Plan Vive homes.