1.0

The pressure to industrialise is already here. What is missing is judgement.

Industrialised construction is set to become the new way to design, manufacture and build. But the decision is made project by project: whether to do it, how much and with whom.

Maximum does not mean optimal: industrialise what matters, when it matters.

The three starting questions

  1. 01Should I industrialise?
  2. 02How much, and which parts?
  3. 03With which system, and with whom?
01

Deep-rooted forces are driving the market

Labour shortages, housing demand, pressure on timescales and sustainability, and public support for industrialised housing.

02

The decision is made without an independent adviser

Today the answers to those questions usually come from the manufacturer: free of charge and with a vested interest.

03

Buying components is not industrialising

Prefabricated bathrooms or a prefabricated façade do not change the outcome if every building is still a prototype.

04

Four pieces are needed at once

Industrialisation strategy, DfMA engineering, digitalisation and software. At Wise Build they are all under one roof.

The thesis

2.0

The building is the vehicle. The system is the product.

Today every building is a prototype: it is built once, the team disbands and the learning is lost between trades, phases and projects. Build to Value turns projects into products: a system owned by the client (manual, kit of parts, archetypes) in which industrialising is a conditional decision and every project returns the system improved.
Today · Project

Every building is a prototype

One-off building

  • Built only once
  • The team disbands
  • The learning is lost
Build to Value · Product

Every building is the first of a series

Kit of parts

01

02

03

  • A system of its own: manual, kit of parts, archetypes
  • Industrialise only when it makes sense, and to the right degree
  • Every project returns the system improved

The method

2.1

A cycle that learns, two layers, three disciplines.

The industry's usual cycle ends at operation. The method adds steps 05 and 06: capturing what was learnt and versioning the system, so that the next project starts where this one ended.

A cycle that learns

build
  1. 01Design
  2. 02Manufacture
  3. 03Build
  4. 04Operate
  5. 05Capture
  6. 06Version
value.

↺ next building · v+1

Two layers

System layer

Strategy · Monitor · Client manual · Continuous improvement

Project layer

Engineering through to the factory

The method belongs to the whole company; the industrialised construction line is its spearhead.

Three disciplines

Industrialisation

DfMA: design for manufacture and assembly.

Strategy, systems and supply chain.

Digital

From the BIM model to the factory and the operational twin.

Configurators and proprietary data.

Lean

Collaborative planning for factory and site.

In alliance with a specialist partner.

What we do

2.2

Six services, one single method.

01

Industrialisation strategy

Should I industrialise, how much and with what? A short, fixed-price engagement with a comparable index.

ForFunds, developers and architects

02

Asset-type platform

A system of your own: manual, kit of parts, archetypes and configurator.

ForFunds and developers with a portfolio

03

Flagship service

Project Monitor

From phase zero to handover. It safeguards the strategy and captures the knowledge.

ForFunds and developers

04

DfMA and productisation

Detail engineering through to the factory, from BIM to CNC, and product development.

ForArchitects, contractors and manufacturers

05

Technology

Configurators, BIM-to-factory connection, digital twin and systems database.

ForIndustrial firms and manufacturers

06

Training

Courses and workshops for project, factory and site teams.

ForArchitects and contractors

The flagship service

2.3

From decision to handover, someone overseeing the process.

The monitor does not take on site supervision: it oversees fidelity to the system and to the quality criteria. It is the project monitoring role that funds already know, applied to an industrialised project.
03Project Monitorsafeguards the strategy from start to finish
  1. Phase 0

    Decision

    where the expensive decisions are made

  2. Phase 1

    Design

  3. Phase 2

    Factory

  4. Phase 3

    Logistics

  5. Phase 4

    Assembly

  6. Phase 5

    Handover and operation

  • Phase 0

    01Strategy

    four axes + economic feasibility · industrialisation index

  • Phases 1-2

    04DfMA and productisation

    from design to the workshop

  • Phases 3-4

    LeanIn alliance

    logistics and assembly

  • Phase 5

    05Technology

    handover digital twin

02Platformwhat is learnt is captured and versioned: the next building starts where this one ended

Who we work with

2.4

Between those who develop and those who manufacture.

Wise Build sits between those who develop and design and those who manufacture, as a systems integrator and specifier.
Those who develop and design
  • Funds and developers

    with a portfolio: rental, hotels, residences

    010203
  • Leading architects

    who are required to industrialise

    010406
  • Contractors

    in design & build: training and cross-cutting engineering

    0604

Systems integrator and specifier05

Database of components, manufacturers and supply chain, at the service of the project

Those who manufacture
  • Precasters

    concrete, steel, timber, bathrooms, building services

    04
  • Manufacturers

    product development and digital factory

    0405
  • Systems and patents

    looking to enter Spain

    04

Independence rule

We never take payment from a manufacturer for recommending their system.

Results

3.0

Results measured on real projects.

−40%

time and cost in one client's structural system

−30%

time and cost in their façade system

+1,000

Plan Vive homes: engineering, digital fabrication and automation

14

projects using the methodology for a single client

References

  • Avintia, Culmia, Kronos, Ferrovial, ACR–Dazia and Casais.
  • Housing, hospitals and stadiums.
  • Concrete and steel-frame systems.

Under one roof

  • Industrialisation strategy.
  • DfMA engineering.
  • Digitalisation and software.

+70 professionals: architects, engineers and developers.

How we start

4.0

Start small: a short engagement at a fixed price.

01

Strategy

  • Should I industrialise, how much and with what?
  • A short, fixed-price engagement
  • Economic feasibility
  • Comparable industrialisation index
02

Project Monitor

On a first project

  • From phase zero to handover
  • Safeguards the strategy
  • Captures what is learned at each phase

It does not take on site supervision: it oversees fidelity to the system and to the quality criteria.

03

Platform

  • The system belongs to the client
  • Manual, kit of parts, archetypes and configurator
  • Every project returns the system improved

Should I industrialise, how much and with what? Let's start with the strategy.

Pablo Medina di Fiori

Build to Value

Pablo Medina di Fiori

pmedina@wisebuild.es
buildtovalue.

Frequently asked questions

5.0

Frequently asked questions, clear answers.

01

What is Build to Value?

It is Wise Build's way of working for industrialised construction: from project to product. It brings together industrialisation, digitalisation and lean so that each client has a system of its own (manual, kit of parts and archetypes) that improves with every project.

02

What services does Build to Value include?

Industrialisation strategy, asset-type platform, Project Monitor, DfMA and productisation, technology (configurators, BIM-to-factory connection, digital twin) and training for project, factory and site teams.

03

What is the Project Monitor in industrialised construction?

The role that accompanies the project from phase zero to handover, safeguards the industrialisation strategy and captures the knowledge. It does not take on site supervision: it oversees fidelity to the system and to the quality criteria, like the project monitoring that funds already know.

04

Does Wise Build recommend specific manufacturers or systems?

It does so independently: Wise Build never takes payment from a manufacturer for recommending its system.

05

What results has Build to Value achieved?

Reductions of 40% in time and cost in one client's structural system and of 30% in its façade system, plus the engineering, digital fabrication and automation of more than 1,000 Plan Vive homes.